Friday 24 April 2020

22 April Update

Set of guidelines to stay on track


Some new ideas that came to mind...





Firstly, I started with the basic stripped down version of the modified cross to help set a basis for what areas my design will take up...

This basic, not very bridgey cross soon transformed into something very different having considered the later exercises conducted...





Rather than having a central tower which had arms, the new design had more potential in fitting the brief of being an architecture that bridges...

Then the requirements for spaces, movement and architectural theory were considered and this was the final product at the end of the day...







No comments:

Post a Comment