Saturday 25 April 2020

26 April Update


  • Construction issues with model were fixed up and slightly more detail was added such as doors and draft textures.
  • Made sure the sizes of all space requirements were practical
  • Mapped out furnishing to be added in order to ensure multi-purposes spaces were usable and practical in real-world use. However, awaiting feedback before fine details added

Front View


Rear Aerial View
Rooftop Studios
Gallery/Library floor

View of Library/Gallery (bottom floor) and Student Study/Meeting area (upper floor) from Workshop
Lecture Theatre Entrance

No comments:

Post a Comment